Please select your home edition
Edition
Maritimo 2019 HEADER

Bayliss Boatworks construction update: Bayliss 75'

by Bayliss Boatworks 7 Dec 2020 08:42 PST
Bayliss 75' © Bayliss Boatworks

Bayliss 75' fairing continues on the outside of the hull as she sees more changes happening on the inside this month.

Construction of the main engine room has gained momentum as the crew completed the battery and bilge boxes and also installed generator shelves. The machine tunnel and forward tankage build out will continue this month in preparation for glass and fairing. Our crews have also made progress on the gyro surround, aft fuel tank surround and pump room build outs.

The ledgers have been installed by our exterior carpentry department, in preparation for the upcoming installation of the cockpit deck.

Read more about Bayliss 75’ here.

Related Articles

Bayliss 67' Overtime construction update
The planking process has been completed After receiving three layers of cold-molded okoume plywood on the bottom and two layers on the hull sides, the planking process for Overtime (Bayliss 67') has officially been completed with the placement of her "whiskey plank". Posted on 10 Feb
Bayliss 75' construction update
The interior is progressing quickly Our greatest note was the installation of her 1,150 gallon forward fuel tank by our mechanical crew. Once in place, the paint crew was able to complete fairing, painting and top coat inside the machine tunnel - forward sole installation is next! Posted on 6 Feb
Bayliss 72' Old Reliable construction update
It won't be long until the cockpit comes to life Old Reliable's (Bayliss 72') cockpit development continues as the coaming and coverboards receive glassing. Our exterior carpentry crew is beginning the teak deck, hand-picking boards for installation. It won't be long until the cockpit comes to life! Posted on 2 Feb
Bayliss 67' Overtime construction update
The hull jigs have been set into place and secured The last few weeks have been eventful in the hull shop for Overtime (Bayliss 67'). With the jig base together, the hull jigs were set into place and secured. Posted on 9 Dec 2020
Bayliss 72' Old Reliable construction update
Soon the Exterior Carpentry crew will glass and paint the lower mezzanine tops Old Reliable (Bayliss 72') continues it's mezzanine development with stainless refrigerator/freezer liners being installed, dry storage compartments being glassed and the switch/control panel installation in the ERC. Posted on 5 Dec 2020
Bayliss 62' Seven construction update
Seven is geared to fish efficiently as possible In late November, Bayliss Boatworks delivered its most recent build to its owners, the 62-foot Seven; the first owners to enjoy two BBW christenings. Posted on 3 Dec 2020
Bayliss 62' Seven construction update
Getting close to her christening date! In October, our department supervisors gathered in the cockpit to depart on Seven's first sea trial. She performed beautifully, surpassing our expectations for speed, even before running gear finalizations. Posted on 2 Nov 2020
Bayliss 62' Seven construction update
On the home stretch with the Paint & Fair Crew hard at work Seven (Bayliss 62') is in the home stretch! In late August, she moved into our paint bay where she received final paint. Our Paint & Fair Crew began their work with the application of a custom-blended shade of Imron "Cool Blue" on Seven's hull. Posted on 3 Sep 2020
Salty Tiger - Bayliss 62' construction update
Set to be delivered this month While it's her custom transom artwork that has garnered the most attention, she also features a teak cockpit deck and coverboards, constructed from hand-selected teak boards. Posted on 6 Jul 2020
Blue View - Bayliss 78' construction update
A product of over 71,000 man hours and nearly 30 months of labor Blue View is powered with MTU M96L 16V engines, each with 2,600 horsepower. Her top speed was registered at over 44 knots at completion. This top end speed translates to a 37.5-knot cruise at 2150. Posted on 2 Jun 2020
Highfield Boats - PBW - FOOTERSea Sure 2020 - SHOCK-WBV - FOOTERMaritimo 2019 Footer