Bayliss Boatworks new construction update - Bayliss 75' Wave Paver

by Bayliss Boatworks 3 Jun 2022 13:40 PDT
Bayliss 75' Wave Paver © Bayliss Boatworks

We are excited to announce the completion of our latest 75' custom sportfishing yacht to hit the water: Wave Paver.

Now that our work on the project is finished, we look back with pride to just over two years ago when her owners approached us to discuss their second build.

It is an honor to build each and every hull, but it is an exceptional privilege when customers choose us for a second time. Wave Paver will be joining a long-standing and very successful fishing program on the tournament circuit, with the original Wave Paver 77'.

The combination of the details, the wood species, the granite, and the interior soft goods all combined to make this build one of our most stunning projects ever. Wave Paver was completely designed in house and is the result of a 28 month build process.

For more information on Wave Paver, visit here!

Related Articles

Bayliss 67': Overtime
Delivered in November 2022 and is a product of 64,141 man hours Bayliss built Overtime as the weapon of choice for an assortment of Cabo San Lucas blue water fisheries. Its elaborate livewell system supports transom and on-deck livewells, as well as tuna tubes. Posted on 2 Dec 2022
Designing the Bayliss walkaround
Once someone becomes a Bayliss owner, they become part of a family Sequentis will be the third Bayliss boat for its owner and crew, so when this family member asked for a special, purpose-driven build, Bayliss Boatworks didn't hesitate to take on the challenge. Posted on 2 Aug 2022
Bayliss Boatworks delivers Old Reliable 72'
Nick Smith is the proud owner of the custom sport fishing yacht Bayliss Boatworks is proud to announce the delivery of Old Reliable, a 72' custom sport fishing yacht. Her christening took place on August 6th, in a gathering with friends and family. Posted on 2 Sep 2021
Bayliss Boatworks new construction updates
Old Reliable (Hull 5) paid a visit to Old Reliable (Hull 25) to see how things were going Old Reliable (Hull 5) paid a visit to Old Reliable (Hull 25), to see how things were going in the final stages of her build. With a few successful fishing trips in the books, she is almost ready for christening on August 6th. Posted on 3 Aug 2021
Bayliss 67' Overtime construction update
The right-side up after her recent flip Before the flip, the hull took shape having the sheer line cut and guards installed. The hull also saw the installation of her spray rails, lower guards, lifting strakes and engine intake vents. Posted on 8 Mar 2021
Bayliss 75' construction update
There have been major developments over the past month With her forward sole installation complete, the exterior carpentry crew installed the lower level interior walls showcasing the four stateroom and three head layout. Posted on 6 Mar 2021
Bayliss 72' Old Reliable construction update
Teak decking and coaming boards installed in the cockpit This past month, more details were checked off on the interior and exterior of Old Reliable (Bayliss 72'). Teak decking and coaming boards were installed in the cockpit while mezzanine lids were glassed before receiving their teak decking. Posted on 3 Mar 2021
Bayliss 67' Overtime construction update
The planking process has been completed After receiving three layers of cold-molded okoume plywood on the bottom and two layers on the hull sides, the planking process for Overtime (Bayliss 67') has officially been completed with the placement of her "whiskey plank". Posted on 10 Feb 2021
Bayliss 75' construction update
The interior is progressing quickly Our greatest note was the installation of her 1,150 gallon forward fuel tank by our mechanical crew. Once in place, the paint crew was able to complete fairing, painting and top coat inside the machine tunnel - forward sole installation is next! Posted on 6 Feb 2021
Bayliss 72' Old Reliable construction update
It won't be long until the cockpit comes to life Old Reliable's (Bayliss 72') cockpit development continues as the coaming and coverboards receive glassing. Our exterior carpentry crew is beginning the teak deck, hand-picking boards for installation. It won't be long until the cockpit comes to life! Posted on 2 Feb 2021