Please select your home edition
Edition
Maritimo 2023 S600 LEADERBOARD

Heesen YN 19550 Project Altea sold

by Heesen Yachts 16 Apr 2021 03:32 PDT
YN 19550 Project Altea © Heesen Yachts

Heesen is delighted to announce the sale of Project Altea, YN 19550, the second yacht to be built on the Nova Plus design and engineering platform.

  • 50-metre, full aluminium construction
  • Ultra-efficient Fast Displacement Hull, shallow draft
  • Exterior by Omega Architects, interior by Cristiano Gatto
  • Twelve guests in six cabins

An all-aluminium 50-metre that features the patented Fast Displacement Hull Form, Altea comes in at just under 500GT, and was begun by Heesen as a speculative build. Her contemporary exterior design by Frank Laupman of Omega Architects soon caught her owners' attention, with its long waterline, vast outdoor spaces, floor-to-ceiling windows and a purposeful profile characterised by chunky spray rails and an almost vertical bow. Once her Cristiano Gatto interior, Dutch pedigree and short delivery time were added to the mix, a deal was soon struck - Altea's owners being already familiar with Heesen's unrivalled levels of quality and craftsmanship, having chartered several recent yachts from the Heesen fleet.

Project Altea's top speed of 19.5 knots and transatlantic cruising range of 3,750 nautical miles at 12 knots come courtesy of two 1,080kW (1,448hp) MTU 12V 2000 M72 engines, and with her FDHF hull design she will be one of the fastest and most economical motor yachts in her class. A draught of just 2.15 metres also makes her the perfect yacht to enjoy the Bahamas' shallow anchorages and the crystal clear seas around Sardinia.

Six elegant staterooms can accommodate twelve guests, while five cabins are provided for the yacht's nine-strong crew. Cristiano Gatto is now working with the owners and their team to fine-tune the yacht's warm and tranquil interior design, with a selection of contemporary loose furniture that will personalise the yacht to their taste and lifestyle. A carefully considered combination of leading brands and custom-designed items will complete the indoor and outdoor spaces, their luxury and comfort eloquently expressed by tactile combinations of simple but refined materials, such as the leather and parquet floor in the main saloon, and the precious Loro Piana fabrics of the bespoke sofa.

While different colour accents underline each cabin's individuality, the main deck is characterised by a deep-sea blue that flows from the saloon through to the master suite. The sky lounge features rich purple hues that extend to the outdoor areas, where bespoke Paola Lenti furniture creates a classic contemporary ambience.

The yacht will be primarily for the use of the owners' family, but will also be available for charter by selected clients. During the purchase process the owners were represented by Franco Ambrosi of Zarpo Yachts. After delivery Project Altea will join the Zarpo Yachts and Tony Lovec Yacht Management fleet, and offered for charter in the Mediterranean and in the Caribbean. Her experienced Italian captain, Antonio Gerini, will supervise the yacht's completion and take the owners to explore the Mediterranean this summer and the Bahamas next winter. Captain Gerini has a long history with Heesen, having previously supervised new builds and captained other yachts in the fleet.

Project Altea will soon leave her dock and will remain in Heesen's harbour for commissioning before going to the North sea for intensive testing. Delivery will be in time for the summer season.

Arthur Brouwer, Heesen CEO, comments: "We are honoured to welcome the owners and their family to the wider Heesen community, and look forward to delivering their dream yacht in time for a glorious Mediterranean summer filled with sunshine, sea breezes, and perfect days."

Specifications:

  • Built by: Heesen Yachts Builders B.V. OSS, The Netherlands
  • Hull type: Twin propeller motor yacht, fast displacement hull form
  • Naval architect: Van Oossanen Naval Architects / Heesen Yachts
  • Interior designer: Cristiano Gatto Design Team
  • Exterior styling: Omega Architects
  • Classification: ABS * A1 commercial yachting service *AMS Large commercial yacht code LY3
  • Hull: Aluminium
  • Superstructure: Aluminium
  • Accommodation: 12 guests in six cabins, nine crew in five cabins
  • Length overall: 49.8m
  • Beam overall: 9.1m
  • Draft at half load: 2.15m
  • Displacement (half load): 316 tons approx.
  • Tonnage: 499 GT approx.
  • Maximum speed (half load): 19.5 knots
  • Range: 3750 nm at 12 knots
  • Fuel capacity: 45000 litres
  • Fresh water capacity: 16000 litres
  • Main engines: 2x MTU 12V 2000 M72
  • Maximum power: 2x 1080 kw
  • Gearbox: 2x ZF 3350
  • Engine control: MTU Blue Vision NG
  • Propellers: 2x five blade fixed pitch
  • Generators: 2x Zenoro, each 118kw, 50 hertz
  • Energy storage: Magnus Marine ES200 80 kva virtual generator with 64 kwh batteries
  • Bowthruster: Electrically driven make ZF-Marine 90kw
  • Stabilisers: Naiad Dynamics, 2 Fins, Type 720, Zero Speed
  • Fresh water maker: 1x Idromar, capacity 12000 litres per day
  • Hot water boiler: 2x 200 litres
  • Sanitary treatment: Hamann HL-Cont plus 025
  • Air conditioning: Heinen & Hopman
  • Anchor winch: 2x Maxwell 11000 VWC
  • Mooring capstan: 2x Maxwell 8000 VC
  • Passarelle: Hydromar Seascape
  • Tender crane: Hydromar SWL 2400 kg
  • Jacuzzi: Poolspa Victoria
  • Tender LxB: 6.2m x 2.6m
  • Tender weight: 2000kg WET
  • Water scooter LxB: 3.3m x 1.25m

Related Articles

Heesen delivers the 50m Cinderella Noel IV
The owners christened their yacht on December 23, 2023, in an unforgettable ceremony Heesen is delighted to announce the delivery of YN 20150 Cinderella Noel IV after intensive tests in the North Sea. Posted on 23 Apr
Heesen delivers the first yacht of 2024
YN 20255, now named Iris Blue Heesen is delighted to announce the delivery of the first yacht of the restyled 55-metre series following intensive tests in the North Sea. Posted on 1 Feb
Heesen launches YN 20150 Project Oslo24
Now named MY Cinderella Noel IV Heesen is delighted to announce the christening of Project Oslo24 in the presence of the owners, their family and friends, as well as the Heesen employees and subcontractors responsible for her construction. Posted on 23 Dec 2023
Project Setteesettanta construction milestone
The official keel laying of the 57-metre full custom YN 20857 Heesen is proud to announce that the official keel laying of the 57-metre full custom YN 20857, code-named Project Setteesettanta, took place on December 14 in the presence of the Lloyds Register surveyor at our shipyard in Oss. Posted on 20 Dec 2023
Project Venus YN 20655 update
The hull and superstructure are now joined together Heesen Yachts is delighted to confirm that the construction of YN 20655, code-named Project Venus, is proceeding on schedule, and the yacht is available for sale with delivery foreseen for the second quarter of 2025. Posted on 20 Oct 2023
Project Orion's hull and superstructure joined
Orion will take the owners and guests across the seven sea in perfect silence up to 10 knots Heesen is delighted to announce that the construction of YN 20750, also known as Project Orion, is proceeding on schedule. The hull and superstructure were joined together at the facility in Oss. The yacht is available for delivery in Q1 2025. Posted on 1 Sep 2023
YN 20067 Project Sparta hits the water
At 67 metres, she is Heesen Yachts largest steel motoryacht so far I am delighted to share with you that on June 9, we launched YN 20067, named MY Sparta. At 67 metres, she is our largest steel motoryacht so far. We built very low hull supports to ensure smooth and safe launching. Posted on 17 Jun 2023
YN 20655 Project Venus update
Dutch Craftsmanship and Italian Design meet Heesen is pleased to announce that YN 20655 (Project Venus), the latest addition to their best-selling 55-metre Steel Class, is currently in build at Talsma in Friesland, North of Holland. Posted on 11 Jun 2023
YN 20555 Project Serena update
Serena's steel hull arrived in Oss after a 2-day trip by sea, canal and river from north of Holland Heesen is delighted to confirm that the construction of YN 20555, code-named Project Serena, is proceeding on schedule for delivery to her owners in the Fall of 2024. Posted on 5 May 2023
YN 20457 Project Akira has new owners
First of the new 57-metre Aluminium Series Heesen is delighted to announce the sale of Project Akira, YN 20457, with Wes Sanford of Northrop & Johnson and James Corts of MarineMax introducing the client. Posted on 12 Apr 2023
Maritimo 2023 S600 FOOTER